45+ Years of Experience Istanbul 24/7 Emergency Service
+90 535 729 49 25

EV Charging Station Installation

AC and DC fast EV chargers, single-villa to public stations. Type 2, CCS2, CHAdeMO with OCPP backend support.

What is EV Charging Station Installation?

EV charging infrastructure ranges from 7 kW home AC chargers to 350 kW DC fast-charging stations. Each requires correct grid analysis, panel reinforcement, communication protocols (OCPP) and compliance with TEDAŞ/EMRA regulations.

Our Service Scope

We install residential AC chargers (3-22 kW), commercial AC stations (multi-port), DC fast chargers (50-350 kW) and complete OCPP-compliant backend integration for billing and monitoring.

Our Service Scope

Residential AC Charging

Wallbox installation, panel upgrade if needed, RCD type-B compliance, smart-home integration.

Commercial AC Stations

Multi-port stations for offices, hotels, parking lots; load management; reservation systems.

DC Fast Chargers

50-350 kW units, transformer sizing, MV connection, cooling-system installation.

Backend & OCPP Integration

OCPP 1.6/2.0 setup, payment integration (POS, mobile, RFID), management dashboard.

Benefits We Deliver

  • Compliance with TEDAŞ and EMRA regulations
  • Future-proof: OCPP backend swappable across vendors
  • Optimal site survey to avoid grid upgrade surprises
  • Single contractor for power, mounting, communication and backend
  • Available revenue model for commercial deployments

Who We Serve

Homeowners, hotels, malls, fleet operators, OIZ tenants, gas stations diversifying to EV, municipality infrastructure projects and EV manufacturer distribution networks.

📞 Call Me Back

Leave your number, we'll call you as soon as possible.

Urgent? Call directly: +90 535 729 49 25

FAQ

Frequently Asked Questions

Do I need a panel upgrade for home AC charging?

For 7 kW (32A) usually no, but we always do a load survey. For 11-22 kW (3-phase, 16-32A per phase) often yes — included in our package.

How long does DC fast-charger installation take?

2-4 weeks for a single 150 kW unit including civil works and MV connection. Multi-unit stations 4-8 weeks. We handle EMRA permitting.

Can existing parking be retrofitted?

Yes. We assess panel capacity, propose load-management for limited supply, design conduit routes and install — typical retrofit is 1-2 weeks per 4 charging spots.

Get a free quote for your project

Power born of experience, service that lasts.

+90 535 729 49 25