AC and DC fast EV chargers, single-villa to public stations. Type 2, CCS2, CHAdeMO with OCPP backend support.
EV charging infrastructure ranges from 7 kW home AC chargers to 350 kW DC fast-charging stations. Each requires correct grid analysis, panel reinforcement, communication protocols (OCPP) and compliance with TEDAŞ/EMRA regulations.
We install residential AC chargers (3-22 kW), commercial AC stations (multi-port), DC fast chargers (50-350 kW) and complete OCPP-compliant backend integration for billing and monitoring.
Wallbox installation, panel upgrade if needed, RCD type-B compliance, smart-home integration.
Multi-port stations for offices, hotels, parking lots; load management; reservation systems.
50-350 kW units, transformer sizing, MV connection, cooling-system installation.
OCPP 1.6/2.0 setup, payment integration (POS, mobile, RFID), management dashboard.
Homeowners, hotels, malls, fleet operators, OIZ tenants, gas stations diversifying to EV, municipality infrastructure projects and EV manufacturer distribution networks.
For 7 kW (32A) usually no, but we always do a load survey. For 11-22 kW (3-phase, 16-32A per phase) often yes — included in our package.
2-4 weeks for a single 150 kW unit including civil works and MV connection. Multi-unit stations 4-8 weeks. We handle EMRA permitting.
Yes. We assess panel capacity, propose load-management for limited supply, design conduit routes and install — typical retrofit is 1-2 weeks per 4 charging spots.
Power born of experience, service that lasts.