Distribution panels, motor-control centers, automation panels and energy-monitoring panels. CE/TSE compliant manufacturing.
Electrical panels are the operational heart of any facility — distribution, protection, control and monitoring all converge here. Quality of design and manufacturing directly determines reliability of every connected load.
We engineer and build main and sub-distribution panels, motor control centers (MCC), automation panels (PLC/SCADA), compensation panels and energy-monitoring panels to CE/TSE standards.
Up to 6300A main panels with copper busbars, type-tested compartments, full short-circuit rating.
Drawer or fixed-mount; Siemens, Schneider or ABB content; integrated VFD support.
PLC/HMI/SCADA-ready, climate-controlled, ESD-protected wiring layout.
PowerLogic, ION or in-house meters; web-based dashboards; line-level KPIs.
OIZ factories, hotels, hospitals, residential estates, malls, data centers, R&D facilities, food processing plants and any project needing certified custom panels.
Depending on size and complexity: 7-21 working days from approved drawing. Standard distribution panels closer to 7 days; complex MCCs 3-4 weeks.
Yes — single-line diagram, panel layout, wiring schematics and BOM are issued for client approval before production starts.
Standard panels are type-tested. Arc-flash certification (IAC) available on request — typically for OIZ and large industrial projects.
Power born of experience, service that lasts.